运架一体式架桥机上跨陇海铁路架梁施工技术

罗会银

四川水力发电2025,Vol.44Issue(6):1-4,62,5.
四川水力发电2025,Vol.44Issue(6):1-4,62,5.DOI:10.20196/j.cnki.scslfd.20250601

运架一体式架桥机上跨陇海铁路架梁施工技术

Construction technology for erecting box girders overpassing Lanzhou-Lianyungang Railway using integrated transport and erection box girders machine

罗会银1

作者信息

  • 1. 中国水利水电第七工程局有限公司,四川 成都 610213
  • 折叠

摘要

Abstract

The newly-built Zhengzhou-Xuzhou High-Speed Rail Link,with a reserved connection to the Zheng-zhou-Wanzhou Railway,is designed for a speed of 250 km/h and features ballastless continuous welded track.During the beam transport and erection for Piers 0#-213#of the Ekai No.1 Viaduct,the alignment intersects with both the Zhengzhou-Xi'an and Zhengzhou Airport Intercity Railway lines,with the box girder between Piers 34#and 35#spanning over the Lanzhou-Lianyungang Railway.The Lanzhou-Lianyungang Railway is a busy,electrified double-track route running east to west,serving both passenger and freight traffic,with an av-erage train interval of three minutes in the Zhengzhou section.Erecting box girders overpassing the Lanzhou-Lianyungang Railway is a critical,high-risk operation with tight time constraints.This paper describes the safety-critical box girder erection techniques employed by a 900t transport and erection machine.

关键词

运架一体机/上跨/陇海铁路/要点施工/箱梁架设/施工技术

Key words

integrated transport and erection machine/overpass/Lanzhou-Lianyungang Railway/critical opera-tion/box girder erection/construction technology