金川水电站坝基覆盖层处理方案的研究与应用
Research and application of treatment scheme for dam foundation overburden of Jinchuan Hydropower Project
廖果1
作者信息
- 1. 中国水利水电第七工程局有限公司,四川 金川 624100
- 折叠
摘要
Abstract
Based on the Jinchuan Hydropower Project on the Dadu River,foundation treatment tests and scheme comparison studies were conducted under complex geological conditions.Riverbed overburden resurveys,on-site dynamic compaction tests,and consolidation grouting tests were conducted.The physical and mechanical properties of the riverbed overburden and the distribution characteristics of various rock formations at the dam site were determined.The reinforcement effects of different overburden treatment schemes were evaluated,and the final overburden reinforcement measures and construction techniques were determined.These solutions ad-dressed engineering challenges such as deformation control and coordination between the dam foundation and the dam body,and uneven settlement of the overburden in the toe plate and connecting plate areas.A compre-hensive dam foundation reinforcement scheme was proposed and implemented,including excavation and re-placement of the shallow sand layer on the foundation surface,combined with dynamic compaction and consoli-dation grouting,and supplemented by vibratory rolling of the dam foundation.This scheme achieved satisfacto-ry results.关键词
金川水电站/覆盖层/基础处理Key words
Jinchuan Hydropower Project/overburden/foundation treatment分类
建筑与水利引用本文复制引用
廖果..金川水电站坝基覆盖层处理方案的研究与应用[J].四川水力发电,2025,44(6):17-20,62,5.