滇中引水工程复杂隧洞口及下穿省道段施工控制技术

曹绍龙

四川水力发电2025,Vol.44Issue(6):31-36,6.
四川水力发电2025,Vol.44Issue(6):31-36,6.DOI:10.20196/j.cnki.scslfd.20250608

滇中引水工程复杂隧洞口及下穿省道段施工控制技术

Construction control technology for complex tunnel portals and underpass sections of provincial highways in the Yunnan Central Water Diversion Project

曹绍龙1

作者信息

  • 1. 中国水利水电第七工程局有限公司,四川 成都 611730
  • 折叠

摘要

Abstract

The entrance of Mopanshan Tunnel of Dali Section of the Central Yunnan Water Diversion Project is located in the soft rock deformation hole section.The import is connected to the Zhouguankou culvert.It is used to excavate the hidden culverts,and the high slope of the hole face is formed through the excavation of the hidden culverts.Complex geological conditions lead to protruding deformation;plus the shallow opening of the hole is the buried section that underpasses through the provincial road,increasing the difficulty of tunnel con-struction.In order to ensure the smooth progress of the project,the construction of the cave face slope and un-derpass section is carried out through optimization of support systems and strengthening process control,etc.,and detailed explanation is given in accordance with geological conditions,high slope slope ratio,underpass depth,stress load,etc.,in order to provide reference for similar projects.

关键词

滇中引水工程/软岩隧洞/洞脸高边坡/下穿省道/施工控制

Key words

Central Yunnan Water Diversion Project/soft rock tunnel/high slope of cave face/underpass provin-cial road/construction control

分类

建筑与水利

引用本文复制引用

曹绍龙..滇中引水工程复杂隧洞口及下穿省道段施工控制技术[J].四川水力发电,2025,44(6):31-36,6.