四川水力发电2025,Vol.44Issue(6):120-124,5.DOI:10.20196/j.cnki.scslfd.20250627
硬梁包水电站三期上游围堰基础处理研究
Study on phase Ⅲ cofferdam foundation treatment of Yingliangbao Hydropower Project
刘婉婷 1相昆山1
作者信息
- 1. 中国电建集团成都勘测设计研究院有限公司,四川 成都 610031
- 折叠
摘要
Abstract
This paper mainly studies the foundation treatment method of upstream concrete cofferdam.By es-tablishing a three-dimensional finite element model,the distribution of stress at the foundation of the concrete cofferdam was analyzed by using the frame-type jet grouting continuous wall foundation treatment method and the jet grouting continuous wall pile foundation replacement method.The results show that both the frame-type jet grouting continuous wall foundation treatment method and the jet grouting continuous wall pile foun-dation replacement method can share most of the stress of the concrete cofferdam bottom to satisfy the bearing capacity of foundation,but the frame-type jet grouting continuous wall foundation treatment method will cause large uneven foundation settlement.Through the calculation and actual operation,it is found that the jet grou-ting continuous wall pile foundation replacement method is more effective to solve the foundation treatment problem on the soft overburden.关键词
硬梁包水电站/有限元/上游混凝土围堰结构/应力Key words
Yingliangbao Hydropower Project/finite element/upstream concrete cofferdam/stress分类
建筑与水利引用本文复制引用
刘婉婷,相昆山..硬梁包水电站三期上游围堰基础处理研究[J].四川水力发电,2025,44(6):120-124,5.