| 注册
首页|期刊导航|云南水力发电|水库除险加固工程渗漏勘察分析与防渗措施

水库除险加固工程渗漏勘察分析与防渗措施

朱金海

云南水力发电2025,Vol.41Issue(12):38-41,4.
云南水力发电2025,Vol.41Issue(12):38-41,4.DOI:10.3969/j.issn.1006-3951.2025.12.009

水库除险加固工程渗漏勘察分析与防渗措施

Analysis and Anti-seepage Measures for Leakage Investigation and Reinforcement Engineering of Reservoirs

朱金海1

作者信息

  • 1. 东莞市水利勘测设计院有限公司,广东 东莞 523000
  • 折叠

摘要

Abstract

Due to historical construction conditions,engineering geological conditions,and later operation and maintenance management limitations,reservoir reinforcement projects often face problems such as dam leakage and foundation leakage during operation,which seriously threaten the stability and safety of the reservoir.Taking Longtan Reservoir reinforcement project in Qingxi Town,Dongguan City as an example,based on the geological status of the reservoir,this paper conducted a detailed survey and adopted geological surveying,drilling,in-situ testing,and indoor testing methods to evaluate the engineering geological conditions of the reservoir area and dam site area in detail.The reasons,locations,and impact degrees of leakage during the operation of the project were obtained,and clear anti-seepage measures were proposed based on the survey analysis results.

关键词

水库/除险加固/地质勘察/渗漏分析

Key words

reservoir/risk elimination and reinforcement/geological survey/leakage analysis

分类

建筑与水利

引用本文复制引用

朱金海..水库除险加固工程渗漏勘察分析与防渗措施[J].云南水力发电,2025,41(12):38-41,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文