海河水利Issue(12):25-28,33,5.DOI:10.3969/j.issn.1004-7328.2025.12.005
梅花山水库钢结构分层取水方案比选论证
Comparison and Demonstration of Stratified Water Intake Schemes for the Steel Structure of Meihuashan Reservoir
ZHONG Yangyong1
作者信息
- 1. Fujian Anlan Hydro-electricity Reconnaissance Design Institute Co.Ld.,Longyan 364000,China
- 折叠
摘要
Abstract
In recent years,continuous improvements have been made to the tap water penetration rate in Fujian Province,with rural tap water penetration and large-scale water supply coverage reaching 97.25%and 73.06%,respectively.As reservoirs are vital water sources for treatment plants,scientifically rational water intake methods are directly related to the safety and stability of water supply quantity and quality.Taking the intake of Meihuashan Reservoir in Shanghang County,Longyan City as a case study,a comparative selection was conducted among four water intake methods:reinforced concrete stratified intake,floating barge intake,slope horizontal pipe intake,and steel structure stratified intake.The steel structure stratified intake was ultimately recommended.Regarding the water transmission pipeline crossing the dam,the scheme of installing an intake pipe inside the existing emptying pipe was selected.The project has been implemented and is operating normally,providing a reference for similar projects.关键词
分层取水口/钢结构取水口/方案比选Key words
stratified water intake/steel structure water intake/scheme comparison and demonstration分类
建筑与水利引用本文复制引用
ZHONG Yangyong..梅花山水库钢结构分层取水方案比选论证[J].海河水利,2025,(12):25-28,33,5.