| 注册
首页|期刊导航|有色金属科学与工程|大区域点柱式上向分层采场顶板稳定性研究

大区域点柱式上向分层采场顶板稳定性研究

ZHOU Tailong LI Guangtao SHI Zhangwu GU Yingchun LI Zibing WANG Jun DENG Yahong

有色金属科学与工程2025,Vol.16Issue(6):922-932,11.
有色金属科学与工程2025,Vol.16Issue(6):922-932,11.DOI:10.13264/j.cnki.ysjskx.2025.06.010

大区域点柱式上向分层采场顶板稳定性研究

Roof stability of large-area point pillar upward horizontal cut-and-fill stopes

ZHOU Tailong 1LI Guangtao 1SHI Zhangwu 2GU Yingchun 3LI Zibing 1WANG Jun 1DENG Yahong3

作者信息

  • 1. School of Land and Resources Engineering,Kunming University of Science and Technology,Kunming 650093,China
  • 2. Yunnan Copper Co.,Ltd.,Kunming 650093,China
  • 3. Yuxi Mining Co.,Ltd.,Yuxi 653100,Yunnan,China
  • 折叠

摘要

Abstract

This study conducted an in-depth investigation into the roof stability characteristics of large-area point pillar stopes at the Dahongshan Copper Mine.The research revealed that as the sublevel height and mining scope increased,roof safety hazards became progressively more severe,posing significant threats to the safety and stability of mining operations.Focusing on the roof of stopes in the unmined areas of the mine,this study comprehensively employed catastrophe theory and numerical analysis to assess the roof safety conditions and evaluate the risks associated with continuing extraction using the current mining methods.The analysis indicated that the point-pillar upward cut-and-fill method was feasible and effective for the 180 m sublevel at Dahongshan Copper Mine when the mining height was below 70 m.However,when the extraction reached heights of 80-90 m,stress concentration in surrounding unmined areas led to increased roof safety risks.At the full 180 m mining height,the plastic zone of the roof increased by nearly 100%,with a failure height reaching 10 m.Continued application of this mining method under these conditions would present serious safety challenges.

关键词

点柱式上向水平分层充填法/大区域点柱式采场/顶板稳定性/突变理论

Key words

point-pillar upward horizontal cut-and-fill mining method/large-area point-pillar stopes/roof stability/mutation theory

分类

矿业与冶金

引用本文复制引用

ZHOU Tailong,LI Guangtao,SHI Zhangwu,GU Yingchun,LI Zibing,WANG Jun,DENG Yahong..大区域点柱式上向分层采场顶板稳定性研究[J].有色金属科学与工程,2025,16(6):922-932,11.

基金项目

云南省基础研究专项-青年资助项目(202101AU070022) (202101AU070022)

昆明理工大学人培基金资助项目(KKZ3202021040,KKSY201921017) (KKZ3202021040,KKSY201921017)

有色金属科学与工程

OA北大核心

1674-9669

访问量0
|
下载量0
段落导航相关论文