水力发电2026,Vol.52Issue(1):32-37,6.
大中型水利水电工程移民后期扶持政策走向研究
Policy Trend of Resettlement Post-support for Large and Medium-sized Water Conservancy and Hydropower Projects:The Resettlement Survey of Hydropower Project B in Province S
摘要
Abstract
The current resettlement post-support policy of large and medium-sized reservoir projects in China will expire in 2026.Whether the support policy will continue after its expiration is a focal point of concern.Taking the resettlement of the hydropower project B in Province S as a case,an evaluation system encompassing economic,psychological,policy compliance,social integration and governance,and reference schemes is constructed based on the multiple streams framework,and the advantages and disadvantages of five potential scenarios following the expiration of post-support policy are assessed by the expert evaluation method and a quantitative comparison is carried out.The study finds that the"Continuation of direct subsidies and project support after expiration"demonstrates the best overall performance.Based on this,it is proposed to scientifically extend the resettlement post-support policy for large and medium-sized reservoir projects,incorporate impoverished resettlers into the national citizen assistance system simultaneously,and continuously optimize project supports.关键词
水库移民/后期扶持/政策延续/多源流理论Key words
reservoir resettlement/post-support/policy continuation/multiple streams framework分类
社会科学引用本文复制引用
PAN Fei,CUI Hongmei,SUN Zhonggen,SHI Xinchuan,ZHANG Ming,WANG Xinyao,ZHU Xuli..大中型水利水电工程移民后期扶持政策走向研究[J].水力发电,2026,52(1):32-37,6.基金项目
国家自然科学基金面上项目(72374064) (72374064)
国家社科基金重大项目(21&ZD183) (21&ZD183)