基于GI-CV组合赋权的高填方边坡施工风险评估

WANG Xiaoquan DU Yimou SHEN Hao PENG Yifeng NIE Ning WANG Xiaoming

水力发电2026,Vol.52Issue(1):81-88,8.
水力发电2026,Vol.52Issue(1):81-88,8.

基于GI-CV组合赋权的高填方边坡施工风险评估

Risk Assessment of High-fill Slope Construction Based on GI-CV Combination Weighting

WANG Xiaoquan 1DU Yimou 1SHEN Hao 1PENG Yifeng 1NIE Ning 1WANG Xiaoming2

作者信息

  • 1. Western Hubei Geological Design Co.,Ltd.,Yichang 443100,Hubei,China||The Seventh Geological Brigade of Hubei Geological Bureau,Yichang 443100,Hubei,China
  • 2. School of Urban Geology and Engineering,Hebei GEO University,Shijiazhuang 050031,Hebei,China
  • 折叠

摘要

Abstract

In view to the complexity and uncertainty of slope construction processes,a risk assessment model for high-fill slope construction is proposed based on a combination of sequence relationship analysis and coefficient of variation methods.Firstly,the methods such as frequency analysis,literature review and expert consultation are used to establish a risk evaluation indicator system from four aspects of geological conditions,construction environment,triggering conditions and construction design.Secondly,the objective and subjective weights of the evaluation indicators are determined using the order relationship analysis method and the coefficient of variation method,respectively,and the combined weights are determined based on the principle of minimum discriminative information for classifying the risk indicators for high-fill slope construction into different grades,and then an evaluation matrix is constructed using trapezoidal membership functions.Finally,the assessment model is applied to evaluate the risk of the target layer.The analysis results of the embankment slope adjacent to a waste treatment facility in Yichang City indicate that the construction risk of the slope falls between Grade Ⅲ and Grade Ⅳ,leaning more toward Grade Ⅳ risk,with relatively low risk,consistent with actual results,thereby validating its reliability and accuracy.

关键词

高填方边坡/施工风险/风险评估/序关系分析法/变异系数法/组合赋权/梯形隶属度函数

Key words

high-fill slope/construction risk/risk assessment/order relation analysis method/coefficient of variation method/combination weighting/trapezoidal membership function

分类

交通工程

引用本文复制引用

WANG Xiaoquan,DU Yimou,SHEN Hao,PENG Yifeng,NIE Ning,WANG Xiaoming..基于GI-CV组合赋权的高填方边坡施工风险评估[J].水力发电,2026,52(1):81-88,8.

基金项目

国家自然科学基金资助项目(41902298) (41902298)

河北省自然科学基金资助项目(D2019403151) (D2019403151)

水力发电

0559-9342

访问量0
|
下载量0
段落导航相关论文