| 注册
首页|期刊导航|水力发电|超长引水高水头电站大波动过渡过程研究

超长引水高水头电站大波动过渡过程研究

CHEN Xuyun ZHAO Quansheng HAO Jungang ZENG Zhenling ZHOU Zhenzhong ZHANG Jian LI Gaohui

水力发电2026,Vol.52Issue(1):89-95,7.
水力发电2026,Vol.52Issue(1):89-95,7.

超长引水高水头电站大波动过渡过程研究

Transition Process of Large Fluctuations in Ultra-long Water Diversion and High-head Power Stations

CHEN Xuyun 1ZHAO Quansheng 2HAO Jungang 2ZENG Zhenling 2ZHOU Zhenzhong 2ZHANG Jian 3LI Gaohui4

作者信息

  • 1. China Renewable Energy Engineering Institute,Beijing 100120,China||College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210024,Jiangsu,China
  • 2. China Renewable Energy Engineering Institute,Beijing 100120,China
  • 3. College of Water Conservancy and Hydropower Engineering,Hohai University,Nanjing 210024,Jiangsu,China
  • 4. PowerChina Huadong Engineering Corporation Limited,Hangzhou 311122,Zhejiang,China
  • 折叠

摘要

Abstract

Ultra-long water diversion high-head hydropower stations have the characteristics of complex system layout,numerous hydraulic components,frequent operational shift,and difficult to predict transient process,which posing severe challenges to transition process research.To reveal the transient process characteristics and key influencing factors of such complex systems under large disturbance conditions,an ultra-long high-head water conveyance and power generation system is taken as the research object,and the dynamic response characteristics of this system under different operating states are systematically illustrated from four aspects of turbine type,control conditions,water hammer characteristics,and optimization measures.The results show that different turbine types,layout configurations and control strategies have significant impacts on system pressure peaks and surge chamber water-level oscillation patterns.Therefore it is necessary to rationally configure parameters such as surge chamber dimensions and turbine closure laws.The research findings will provide theoretical and practical value for improving the accuracy of regulation guarantee calculations and ensuring the safe and stable operation of high-head long-conduit hydropower systems.

关键词

超长引水/高水头/大波动/过渡过程/组合工况

Key words

ultra-long water diversion/high water head/large fluctuation/transition process/combined operating condition