地下空间(英文)2025,Vol.25Issue(6):74-98,25.DOI:10.1016/j.undsp.2024.10.006
Progressive failure of water-filled karst cave of stratified tunnel using coupled discontinuous smoothed particle hydrodynamics method
Progressive failure of water-filled karst cave of stratified tunnel using coupled discontinuous smoothed particle hydrodynamics method
摘要
关键词
Coupled discontinuous smoothed particle hydrodynamics/Stratigraphic layers/Rock tunnel/Water inrush/Karst caveKey words
Coupled discontinuous smoothed particle hydrodynamics/Stratigraphic layers/Rock tunnel/Water inrush/Karst cave引用本文复制引用
Chengzhi Xia,Zhenming Shi,Liu Liu,Guangyin Lu,Lin Zhou,Chuanyi Tao,Shaoqiang Meng..Progressive failure of water-filled karst cave of stratified tunnel using coupled discontinuous smoothed particle hydrodynamics method[J].地下空间(英文),2025,25(6):74-98,25.基金项目
This research was supported by the National Natural Science Foundation for Doctoral Scholars(Grant No.424B2055)and National Key Research and Development Program of China(Grant No.2023YFC3008300),the National Natural Science Foundation of China(Grant Nos.42172296 and 41974148),and the International Exchange Program for Graduate Students of Tongji University.We extend our gratitude to Professor Bo Li from Tongji University for his support with the flume experiments. (Grant No.424B2055)