江苏水利Issue(1):25-28,4.
基于MIKE11的东平河整治工程行洪能力提升模拟研究
Simulation study on flood discharge capacity improvement of Dongping River Regulation Project based on MIKE11
摘要
Abstract
Based on hydrological,topographic and engineering design data,a one dimensional unsteady hydrodynamic model(MIKE11)of Dongping River was established.After model calibration and verification,the flood routing processes before and after the implementation of engineering measures such as river dredging and cross section excavation were simulated and analyzed under the design storm condition with a 10-year return period.The results show that the comprehensive regulation project of Dongping River can effectively reduce the flood water level of the river channel,significantly improve the discharge capacity of key reaches of the main stream and tributaries,and meet the flood control requirements of different sections.The relevant research results can provide a reference for river regulation in similar regions.关键词
水动力模型/河道整治/行洪能力/东平河Key words
hydrodynamic model/river regulation/flood discharge capacity/Dongping River分类
建筑与水利引用本文复制引用
胡杨,俞小钦,张冰冰..基于MIKE11的东平河整治工程行洪能力提升模拟研究[J].江苏水利,2026,(1):25-28,4.