工矿自动化2025,Vol.51Issue(12):63-71,108,10.DOI:10.13272/j.issn.1671-251x.2025070055
高密度电法在煤矿顶板水力压裂效果评估中的应用研究
High-density electrical method for evaluating effectiveness of hydraulic fracturing of coal mine roofs
摘要
Abstract
To address the problems of poor spatial continuity and difficulty in achieving real-time dynamic feedback in traditional evaluation methods for coal mine roof hydraulic fracturing-such as borehole observation,microseismic monitoring,acoustic emission,or roadway deformation detection-the high-density electrical method combined with electrical resistivity tomography is innovatively adopted to realize dynamic,quantitative,and three-dimensional visualization monitoring of fracture development and fracturing fluid migration during the fracturing process.Taking the 112205 working face of No.1 Coal Mine of Shaanxi Xiaobaodang Mining Co.,Ltd.as the engineering background,continuous apparent resistivity surveys were carried out before,during,and after the staged fracturing of the XBD-02L horizontal well.Based on resistivity variations,a quantitative evaluation index ρSL for fracturing effectiveness was proposed.The detection results showed that the effective influence range of fracturing reached up to 200 m in the horizontal direction and 57 m in the vertical direction,and the fracturing fluid exhibited a dynamic diffusion-loss process.Multi-source verification of the high-density electrical results was conducted by integrating geophysical and engineering data:audio-frequency electrical penetration imaging demonstrated that resistivity anomaly zones were highly consistent with water-rich structures,and mine pressure monitoring data indicated that the periodic weighting interval in the fractured area was reduced by 39.35%,showing a significant mine pressure mitigation effect.Based on high-density electrical detection,a dynamic visualization monitoring and quantitative evaluation system for the entire process of coal mine roof hydraulic fracturing is established,which provides key technical support for optimizing hydraulic fracturing design and ensuring safe and efficient coal mining.关键词
矿压控制/顶板水力压裂/高密度电法/电阻率层析成像/动态可视化监测/压裂效果定量评价Key words
mine pressure control/roof hydraulic fracturing/high-density electrical method/electrical resistivity tomography/dynamic visualization monitoring/quantitative evaluation of fracturing effectiveness分类
矿业与冶金引用本文复制引用
王高伟,常毛毛,贾栋栋,刘己盛,边疆,李东东,黄鹏昊,苏本玉,蔡武..高密度电法在煤矿顶板水力压裂效果评估中的应用研究[J].工矿自动化,2025,51(12):63-71,108,10.基金项目
国家自然科学基金项目(52374101,W2421032) (52374101,W2421032)
江苏省国际科技合作/港澳台科技合作计划项目(重点国别产业技术研发合作项目)(BZ2024024) (重点国别产业技术研发合作项目)
国家重点研发计划项目(2022YFC3004603). (2022YFC3004603)