阳江核电厂取水构筑物泥沙回淤特征研究

杨波 姜柏军 解鸣晓 李文丹 王恒

水道港口2025,Vol.46Issue(6):854-860,7.
水道港口2025,Vol.46Issue(6):854-860,7.

阳江核电厂取水构筑物泥沙回淤特征研究

Study on the surface sediment and siltation characteristics of water intake structures of Yangjiang Nuclear Power Plant

杨波 1姜柏军 2解鸣晓 2李文丹 2王恒2

作者信息

  • 1. 阳江核电有限公司,阳江 529500
  • 2. 交通运输部天津水运工程科学研究所港口水工建筑技术国家工程研究中心 工程泥沙交通行业重点实验室,天津 300456
  • 折叠

摘要

Abstract

Based on particle size and bathymetry measurements of sediments in the water intake structure of the Yangjiang Nuclear Power Plant,the sediment sources and characteristics were studied,and the siltation mechanism was discussed.The results show that the sediment in the water intake structure enters with the water intake dynamic force from the harbor mouth,and the suspended sediment settles to the seabed where the flow velocity decreases.The siltation rate is low in the main flow path and high at the edges and corners of the harbor basin and wave dissipation pond,and at the end of the channel.Based on bathymetry surveys,the sedimentation rate in the water intake structure of the Yangjiang Nuclear Power Plant is about 0.22 m/a.Furthermore,due to the influence of typhoon waves,a large amount of suspended sediment is stirred up and transported into the water intake structure,resulting in rapid siltation and the formation of a mud layer that persists for more than ten days.

关键词

取水构筑物/回淤特征/阳江核电/底质/台风暹芭/骤淤

Key words

water intake structures/sedimentation characteristics/Yangjiang Nuclear Power Plant/sediment/Typhoon Chaba/rapid siltation

分类

交通工程

引用本文复制引用

杨波,姜柏军,解鸣晓,李文丹,王恒..阳江核电厂取水构筑物泥沙回淤特征研究[J].水道港口,2025,46(6):854-860,7.

基金项目

国家自然科学基金面上项目(52171260) (52171260)

中央级公益性科研院所科研创新基金项目(TKS20250402) (TKS20250402)

水道港口

1005-8443

访问量0
|
下载量0
段落导航相关论文