首页|期刊导航|水力发电学报|考虑水库动态调蓄规则的胶东调水工程协同优化调度研究

考虑水库动态调蓄规则的胶东调水工程协同优化调度研究

郑英 谷峪 王超 王海龙 金鹏宇 甘甜

水力发电学报2026,Vol.45Issue(1):19-30,12.
水力发电学报2026,Vol.45Issue(1):19-30,12.DOI:10.11660/slfdxb.20260103

考虑水库动态调蓄规则的胶东调水工程协同优化调度研究

Study on joint optimal scheduling of Jiaodong Water Transfer Project considering dynamic storage rules of reservoirs

郑英 1谷峪 2王超 3王海龙 2金鹏宇 4甘甜5

作者信息

  • 1. 天津大学 水利工程智能建设与运维全国重点实验室,天津 300350||山东省调水工程运行维护中心,济南 250101
  • 2. 山东省调水工程运行维护中心,济南 250101
  • 3. 中国水利水电科学研究院 流域水循环模拟与调控国家重点实验室,北京 100038
  • 4. 四川大学 水利水电学院,成都 610065
  • 5. 长江科学院,武汉 430000
  • 折叠

摘要

Abstract

Large-scale inter-basin water transfer projects typically manifest the characteristics of multiple water sources,multiple objectives,multiple users,and multiple dimensions,whereas their different water sources,objectives,and water users are often interconnected yet mutually constraining,leading to new challenges in modeling their joint optimal scheduling and solving the problem.This study constructs a new model for water allocation optimization under the reservoirs'dynamic regulation rules,based on a genetic algorithm(GA)framework,and applied in a case study of the Jiaodong Water Transfer Project.We use this model to determine the system's water flow behaviors through accurate water balance simulations,and then design a fitness function via a comprehensive consideration of the constraints and multi-objective requirements of the project.Finally,its updated solutions are adjusted using a reverse correction strategy.To enhance algorithm efficiency,we have developed three key techniques:adopting a phase identification and division method to reduce decision variable dimensionality;determining the optimization adjustment directions based on reservoir regulation rules;and developing an intelligent mechanism for infeasible solution handling.Application of the new model to the transfer project shows a significant improvement on scheduling performance.Compared with the annual operational plan,a full scheduling period scheme raises the minimum water supply reliability at the diversion outlets by 22%,achieving superior water supply outcomes with reduced diversion flow.In the remaining period scheme,the Jihongtan Reservoir achieves a water supply reliability of 74.17%,with a water shortage of 102.2267 million m3 and a water diversion index utilization rate of 98.43%,meeting all the project requirements.This study helps consider and address optimal operation challenges in complex inter-basin water transfer systems.

关键词

调水工程/优化调度/动态调蓄/遗传算法/多目标

Key words

water diversion project/optimal operation/dynamic regulation/genetic algorithm/multi-objective

分类

建筑与水利

引用本文复制引用

郑英,谷峪,王超,王海龙,金鹏宇,甘甜..考虑水库动态调蓄规则的胶东调水工程协同优化调度研究[J].水力发电学报,2026,45(1):19-30,12.