| 注册
首页|期刊导航|铁道标准设计|基于列车能耗与建设成本的重载铁路线路纵断面双目标优化

基于列车能耗与建设成本的重载铁路线路纵断面双目标优化

孙铭浩 曾勇

铁道标准设计2026,Vol.70Issue(1):17-24,40,9.
铁道标准设计2026,Vol.70Issue(1):17-24,40,9.DOI:10.13238/j.issn.1004-2954.202402260006

基于列车能耗与建设成本的重载铁路线路纵断面双目标优化

Bi-objective Optimization of Heavy-Haul Railway Vertical Alignment Based on Train Energy Consumption and Construction Cost

孙铭浩 1曾勇1

作者信息

  • 1. 西南交通大学土木工程学院,成都 610031||西南交通大学高速铁路线路工程教育部重点实验室,成都 610031
  • 折叠

摘要

Abstract

To simultaneously reduce train energy consumption and construction cost in heavy-haul railway vertical alignment optimization,a bi-objective optimization model for heavy-haul railway vertical alignment was established.Mileage and elevation of vertical change points were used as decision variables,while constraints on slope length and gradient were considered.The model aimed to minimize train energy consumption and construction cost.An improved bi-objective particle swarm optimization algorithm was then proposed by integrating the"arena competition"method.The"arena competition"method refined the construction process of the non-dominated solution set,and the global optimal solution was obtained through crowding distance and marginal utility analysis.For performance evaluation,the proposed algorithm was compared with the Exclusion Method using the Inverted Generational Distance(IGD)metric on typical test functions.Finally,the proposed bi-objective optimization model and the improved algorithm were applied to a railway line design case.The results showed that the improved bi-objective particle swarm optimization algorithm based on the"arena competition"method exhibited significantly better performance than the Exclusion Method.When applied to typical test functions,it achieved an IGD value of 0.028,which was 0.052 lower than that of the Exclusion Method,produced 20 Pareto optimal solutions,which was 5 more than that of the Exclusion Method,and required 0.26 s less computational time.Compared with the manually designed scheme,the scheme optimized by the proposed model reduced train energy consumption by 3.44%and construction cost by 22.1%.

关键词

重载铁路/纵断面优化/双目标粒子群改进算法/"擂台赛"法/列车能耗/建设成本

Key words

heavy-haul railway/vertical alignment optimization/improved bi-objective particle swarm optimization algorithm/arena competition method/train energy consumption/construction cost

分类

交通工程

引用本文复制引用

孙铭浩,曾勇..基于列车能耗与建设成本的重载铁路线路纵断面双目标优化[J].铁道标准设计,2026,70(1):17-24,40,9.

基金项目

国家自然科学基金项目(51878576) (51878576)

铁道标准设计

1004-2954

访问量1
|
下载量0
段落导航相关论文