重庆大学学报2026,Vol.49Issue(1):60-69,10.DOI:10.11835/j.issn.1000-582X.2026.01.006
基于序贯决策的桥梁多阶段维修加固策略优化方法
Optimization of multi-stage bridge maintenance strategies based on sequential decision-making
摘要
Abstract
To address the limitation of existing bridge maintenance optimization methods that fail to consider interactions between sequential decisions across the entire service life,this study proposes a multi-stage,two-level optimization framework grounded in sequential decision-making principles.The upper level model determines performance improvement goals for the maintenance sequence,while considering the influence of preceding decisions on subsequent maintenance policies.The lower-level model then identifies the optimal maintenance actions for each component at each stage,subject to the upper-level constraints.Case analysis shows that,while maintaining superior structural condition over the full life cycle,the proposed method reduces cumulative maintenance cost by 28.6%compared with the traditional strategies.Moreover,when the average deterioration rate of the performance condition index is below 1.425 per year,total life-cycle maintenance and rehabilitation cost can be further reduced by reducing the number of decision-making stages.关键词
桥梁/维修加固/序贯决策/双层级决策/动态规划Key words
bridge/maintenance/sequential decision-making/two-level decision-making/dynamic programming分类
建筑与水利引用本文复制引用
刘纲,孙瑞卿,李琦,严琨..基于序贯决策的桥梁多阶段维修加固策略优化方法[J].重庆大学学报,2026,49(1):60-69,10.基金项目
国家重点研发计划项目(2021YFF0501000) (2021YFF0501000)
中央高校基本科研业务费资助项目(2023CDJKYJH093).Supported by the National Key Research and Development Program of China(2021YFF0501000),and Fundamental Research Funds for the Central Universities(2023CDJKYJH093). (2023CDJKYJH093)