| 注册
首页|期刊导航|复杂系统建模与仿真(英文)|Effective NSGA-Ⅱ Algorithm for a Limited AGV Scheduling Problem in Matrix Manufacturing Workshops with Undirected Material Flow

Effective NSGA-Ⅱ Algorithm for a Limited AGV Scheduling Problem in Matrix Manufacturing Workshops with Undirected Material Flow

Xuewu Wang Jianing Zhang Yi Hua Rui Yu

复杂系统建模与仿真(英文)2025,Vol.5Issue(1):68-85,18.
复杂系统建模与仿真(英文)2025,Vol.5Issue(1):68-85,18.DOI:10.23919/CSMS.2024.0023

Effective NSGA-Ⅱ Algorithm for a Limited AGV Scheduling Problem in Matrix Manufacturing Workshops with Undirected Material Flow

Effective NSGA-Ⅱ Algorithm for a Limited AGV Scheduling Problem in Matrix Manufacturing Workshops with Undirected Material Flow

Xuewu Wang 1Jianing Zhang 1Yi Hua 1Rui Yu2

作者信息

  • 1. School of Information Science and Engineering,East China University of Science and Technology,Shanghai 200237,China
  • 2. Institute for Sustainable Manufacturing,Department of Electrical and Computer Engineering,University of Kentucky,Lexington,KY 40506,USA
  • 折叠

摘要

关键词

Iimited automatic guided vehicle(AGV)scheduling problem/nondominated sorting genetic algorithm Ⅱ(NSGA-Ⅱ)/dual population co-evolution/matrix manufacturing workshop

Key words

Iimited automatic guided vehicle(AGV)scheduling problem/nondominated sorting genetic algorithm Ⅱ(NSGA-Ⅱ)/dual population co-evolution/matrix manufacturing workshop

引用本文复制引用

Xuewu Wang,Jianing Zhang,Yi Hua,Rui Yu..Effective NSGA-Ⅱ Algorithm for a Limited AGV Scheduling Problem in Matrix Manufacturing Workshops with Undirected Material Flow[J].复杂系统建模与仿真(英文),2025,5(1):68-85,18.

基金项目

This work was supported by the National Natural Science Foundation of China(No.62076095)and National Key Research and Development Program(No.2022YFB4602104). (No.62076095)

复杂系统建模与仿真(英文)

访问量1
|
下载量0
段落导航相关论文