摘要

Abstract

The on-site consolidation grouting test without cover weight is conducted on the left bank arch shoulder slot of Yebatan Hydropower Station.The consolidation grouting effects of epoxy-based crack sealing materials and cement-based fast-hardening crack sealing materials are analyzed by inspection hole water pressure test,acoustic wave test and borehole deformation modulus test,respectively.The test results show that the crack sealing materials and techniques can achieve a better sealing effect and effectively increase the pressure of heavy consolidation grouting without a cover.The post-grouting performance parameters of the surface rock mass are relatively better than those of the deep rock mass,and the values of each parameter or the value of improvement are relatively better.The uncovered heavy consolidation grouting does not show any significant deficiencies compared with the covered heavy consolidation grouting.

关键词

无盖重固结灌浆/裂隙封闭材料/压水试验/声波测试

Key words

uncovered heavy consolidation grouting/fissure sealing material/water pressure test/acoustic wave test

分类

建筑与水利

引用本文复制引用

肖承京,王新锋,梁慧,赵恒,文俊林..无盖重固结灌浆裂隙封闭现场试验研究[J].水力发电,2026,52(2):108-113,6.

基金项目

中国水利水电第七工程局有限公司科技项目(2022-803-54-30) (2022-803-54-30)

中国中铁股份有限公司科技研究开发计划项目(2023-重大-16) (2023-重大-16)

中国华电集团公司科技项目(CHDKJ22-02-125) (CHDKJ22-02-125)

水力发电

0559-9342

访问量1
|
下载量0
段落导航相关论文