| 注册
首页|期刊导航|云南水力发电|引洮工程二期引、供水规模计算

引洮工程二期引、供水规模计算

沈若寰

云南水力发电2026,Vol.42Issue(1):22-26,5.
云南水力发电2026,Vol.42Issue(1):22-26,5.DOI:10.3969/j.issn.1006-3951.2026.01.006

引洮工程二期引、供水规模计算

Calculation of Water Supply Scale for Tao River Phase Ⅱ Diversion Project

沈若寰1

作者信息

  • 1. 甘肃省水务投资集团有限公司引洮供水公司,甘肃 兰州 743000
  • 折叠

摘要

Abstract

There are problems such as water scarcity and difficulties in obtaining water for people's production and daily life in the central and western regions of Gansu Province.In order to alleviate the water supply and demand contradiction in water scarce areas of Gansu Province,based on the first phase of the Tao River Diversion Project,this paper compares the water supply schemes through the calculation of diversion scale,comparison of total and main canal operation modes,and determination of water supply flow rate.It reasonably analyzed and studied the water diversion,water supply scale,and water supply plan of the second phase of the Tao River water supply project.

关键词

供水/引水/引洮工程/供水规模/供水方案

Key words

water supply/diversion/Tao river diversion project/water supply scale/water supply plan

分类

建筑与水利

引用本文复制引用

沈若寰..引洮工程二期引、供水规模计算[J].云南水力发电,2026,42(1):22-26,5.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文