中国地质2025,Vol.52Issue(6):2045-2058,14.DOI:10.12029/gc20240226002
矿集区找矿预测大数据实体数据模型的界定与构建
Definition and construction of data models of big data entity for prospecting prediction of ore concentration area
摘要
Abstract
This paper is the result of geological survey engineering and mineral exploration engineering. [Objective]A set of methods and technologies for modeling big data entity data models is introduced,in order to predict prospects in mining areas.The connotation and extension of the big data entity data model is also defined.[Methods]This paper is conducted on the fundamental principles of data modeling,the essential steps of database design,as well as the methods and technologies for entity data modeling in big data for predictive analysis in mining regions.[Results]A universal scientific definition and modeling method technology system for the big data entity data model of prospecting prediction in mineral concentration areas is proposed.[Conclusions]The technical specifications of the big data entity data model for prospecting prediction in mining areas were established,along with the development of the corresponding application support software system.This data model successfully integrated the theoretical methods and technical systems for prospecting prediction in mineral concentration areas,resulting in a scientific,systematic,hierarchical,standardized,and informatized approach to prospecting prediction work.These advancements have streamlined the complexity of prospecting predictions and minimized the uncertainty of prediction outcomes.关键词
大数据实体/数据模型/矿集区找矿预测/矿产勘查工程/地质调查工程Key words
big data entity/data model/prospecting prediction of ore concentration area/mineral exploration engineering/geological survey engineering分类
天文与地球科学引用本文复制引用
张志辉,左群超..矿集区找矿预测大数据实体数据模型的界定与构建[J].中国地质,2025,52(6):2045-2058,14.基金项目
中国地质调查局项目(DD20190570、DD20160052)、全国矿产资源潜力评价计划项目(2006-2013年)、老矿山深部和外围找矿计划项目(2012-2014年)、全国危机矿山接替资源找矿国家专项(2004-2010年)联合资助. Supported by the projects of China Geological Survey(No.DD20190570,No.DD20160052),National Mineral Resources Potential Evaluation Plan Project(2006-2013),Deep and Peripheral Prospecting Plan for Old Mines(2012-2014),National Crisis Mine Project National Special Project for Prospecting for Resources(2004-2010). (DD20190570、DD20160052)