水工混凝土大坝液压爬模施工工艺及结构稳定性评估研究

程晓联

陕西水利Issue(2):25-27,31,4.
陕西水利Issue(2):25-27,31,4.

水工混凝土大坝液压爬模施工工艺及结构稳定性评估研究

Research on the Construction Technology and Structural Stability Assessment of Hydraulic Climbing Formwork for Hydraulic Concrete Dams

程晓联1

作者信息

  • 1. 陕西省宝鸡峡工程局,陕西 宝鸡 721000
  • 折叠

摘要

Abstract

As an advanced formwork method,hydraulic climbing formwork technology is widely used in large-scale hydraulic engineering.Taking the Dongzhuang Water Control Project as an example,this study analyzes the effectiveness of the hydraulic climbing formwork system during construction and evaluates its impact on structural stability,construction efficiency,and concrete quality.The results show that the hydraulic climbing formwork system significantly improves formwork stability,increasing the anti-overturning factor from 1.00 to 2.20.The automated lifting and lowering of the formwork enhance construction precision and reduce safety risks associated with high-altitude operations.Under wind speeds of up to 100 km/h,the horizontal displacement of the formwork is 15.5 mm,with a stress of 82.5 MPa.The lift height has a certain influence on stress concentration in the formwork,and hydraulic climbing formwork technology demonstrates excellent adaptability under different lift heights.The study also explores optimization directions for modular design and real-time monitoring systems,and looks into its potential for application in other large-scale hydraulic projects.

关键词

液压爬模施工/结构稳定性/施工效率/风荷载

Key words

Hydraulic climbing formwork construction/Structural stability/Construction efficiency/Wind load