铁路物流2026,Vol.44Issue(2):7-12,21,7.DOI:10.16669/j.cnki.issn.2097-5899.202507280002
货运动车组规模化开行下动车所与高铁物流基地合并建设方案研究
Integrated Construction Scheme of EMU Depot and High Speed Railway Logistics Base under Large-scale Operation of Freight EMUs
摘要
Abstract
To explore the integrated construction of EMU depot and high speed rail logistics base under large-scale freight EMUs operation,this paper studied the operational process and layout requirements of high speed railway express.Two planar layout schemes were proposed:EMU depot expansion and existing yard renovation.Two three-dimensional development schemes were also presented:upper-cover logistics functional area and double-deck yard.Comparative analysis shows that planar expansion suits projects with ample land reserves.Existing yard renovation applies to land-constrained projects with a small demand scale,requiring emphasis on risk isolation and emergency response.The upper-cover logistics functional area scheme fits land-limited projects with medium-to-large demand,necessitating safety management focus during construction and operation phases.The double-deck yard scheme targets strategic urban core projects,requiring solutions for key cross-disciplinary technologies and specialized supporting facilities.The results support the large-scale development of high speed railway express and provide guidance for the integrated construction of EMU depots and high speed railway logistics bases.关键词
高铁物流基地/动车所/高铁快运/建设方案/立体化开发Key words
High Speed Railway Logistics Base/EMU Depot/High Speed Railway Express/Construction Scheme/Three-Dimensional Development分类
交通工程引用本文复制引用
李华俊,杨子涵,袁世成,张萌萌..货运动车组规模化开行下动车所与高铁物流基地合并建设方案研究[J].铁路物流,2026,44(2):7-12,21,7.基金项目
河南省铁路建设投资集团有限公司科研项目(TJTWL-KJCX-FW-2024-45) (TJTWL-KJCX-FW-2024-45)
国家铁路局规划与标准研究院科研项目(2025-YKT-001) (2025-YKT-001)