| 注册
首页|期刊导航|华北水利水电大学学报(自然科学版)|极端暴雨条件下雄安新区防洪排涝系统问题梳理与改进建议

极端暴雨条件下雄安新区防洪排涝系统问题梳理与改进建议

李海潮 杨大文 王思如 朱振铎 魏妍琪 姚轶 李向民 方佩 苏家平 孙金华

华北水利水电大学学报(自然科学版)2026,Vol.47Issue(1):66-72,7.
华北水利水电大学学报(自然科学版)2026,Vol.47Issue(1):66-72,7.DOI:10.19760/j.ncwu.zk.2026008

极端暴雨条件下雄安新区防洪排涝系统问题梳理与改进建议

Analysis of Issues in Flood Control and Drainage System of Xiong'an New Area under Extreme Rainfall Conditions and Suggestions for Improvement

李海潮 1杨大文 1王思如 2朱振铎 1魏妍琪 3姚轶 2李向民 1方佩 1苏家平 1孙金华2

作者信息

  • 1. 清华大学 水圈科学与水利工程全国重点实验室,北京 100084
  • 2. 南京水利科学研究院 水文水资源与水利工程科学国家重点实验室,江苏 南京 210029
  • 3. 西华大学 流体及动力机械教育部重点实验室,四川 成都 610039
  • 折叠

摘要

Abstract

[Objective]This study aims to analyze the performance and deficiencies of the flood control and drainage system in Xiong'an New Area during the ″23·7″ extreme rainstorm,identify existing shortcomings,and provide support for subse-quent optimization of the flood control and drainage system.[Methods]Based on data analysis,field surveys,blueprint analysis,and statistical data,the current status of the flood control and drainage system in Xiong'an New Area was analyzed,with particular emphasis on the river and lake systems and large-scale storage facilities.The overall situation of flood control and drainage,as well as its relationship with basin-wide flood control,was summarized.The main issues in the water system of Xiong'an New Area were identified based on field investigations.Furthermore,the analysis focused on a typical residential area in the Rongdong Area where waterlogging was particularly severe during the ″23·7″ extreme rainstorm,and the main causes of its waterlogging were examined.[Results]Overall,drainage operations in the Qidong Area and Rongdong Area of Xiong'an New Area were orderly.However,several specific issues were revealed,including insufficient capacity of storage fa-cilities,inadequate connectivity between stormwater drainage networks,failure of sponge city facilities in certain areas to meet design standards,and insufficient routine management and maintenance.[Conclusion]The flood control and drainage sys-tem in Xiong'an New Area is generally effective.However,shortcomings remain in both engineering facilities and management and maintenance.In the future,measures such as improving facility layout,enhancing storage capacity,optimizing stormwa-ter pipeline connectivity,strengthening emergency response,and implementing intelligent operation and maintenance should be adopted to comprehensively enhance flood control,drainage capacity,and resilience under extreme rainfall conditions.

关键词

调蓄设施/防洪排涝系统/雨水管理/低影响开发

Key words

storage facilities/flood control and drainage system/stormwater management/low-impact development

分类

建筑与水利

引用本文复制引用

李海潮,杨大文,王思如,朱振铎,魏妍琪,姚轶,李向民,方佩,苏家平,孙金华..极端暴雨条件下雄安新区防洪排涝系统问题梳理与改进建议[J].华北水利水电大学学报(自然科学版),2026,47(1):66-72,7.

基金项目

北京市自然科学基金项目(8254057) (8254057)

国家重点研发计划重点专项(2023YFC3206303) (2023YFC3206303)

清华大学水木学者计划(2023SM015). (2023SM015)

华北水利水电大学学报(自然科学版)

1002-5634

访问量0
|
下载量0
段落导航相关论文