复杂地层三模盾构带压开仓刀具检换施工安全风险管控

樊玉智

路基工程Issue(1):212-217,6.
路基工程Issue(1):212-217,6.DOI:10.13379/j.issn.1003-8825.202512018

复杂地层三模盾构带压开仓刀具检换施工安全风险管控

Study on Safety Risk Management for Pressurized Open-cabin Tool Inspection and Replacement of Triple-mode Shield Tunneling in Complex Strata

樊玉智1

作者信息

  • 1. 中国中铁股份有限公司,北京 100039
  • 折叠

摘要

Abstract

To address the technical challenges of pressure maintenance and high water ingress risk in subsea marine sedimentary layers,sandstone,and other complex strata,this study proposed a comprehensive treatment scheme:"pre-grouting reinforcement+shield tail ring grouting+bentonite mud cake formation".The paper systematically elaborated on the technical characteristics,process principles,construction procedures,and key control measures for pressurized open-cabin tool inspection and replacement of triple-mode shield tunneling in subsea tunnels.By combining a case study of a new energy power generation subsea drainage tunnel project,the advantages of this technology were validated in terms of safety,reliability,construction efficiency,and cost-effectiveness,providing a reference for similar subsea complex strata shield tunneling operations with pressurized open-cabin requirements.

关键词

海底隧洞/三模盾构/透水/地层加固/泥膜制作/复合防护体系/风险控制

Key words

subsea tunnel/triple-mode shield tunneling/water ingress/ground reinforcement/mud cake formation/composite protection system/risk control