- 1. 首钢京唐钢铁联合有限责任公司,河北 唐山 063200
- 折叠
摘要
Abstract
Addressing the blockage issue of feedwater control valves in newly built 100 MW units,the causes of blockage were analyzed,mainly including construction residue,pipeline corro-sion,oxide film shedding,control valve structural design,and operation mode.Corresponding solu-tions were proposed,including strictly controlling feedwater pH,adjusting operating pressure,regu-lar equipment cleaning,and improving the control valve structure.关键词
100MW机组/给水调节阀/堵塞原因Key words