| 注册
首页|期刊导航|冶金动力|新建100MW机组给水调节阀堵塞原因及解决措施

新建100MW机组给水调节阀堵塞原因及解决措施

汪明宇 张小磊 孙玮 宋斌斌 李辉 庞振振

冶金动力Issue(1):57-59,3.
✕
冶金动力Issue(1):57-59,3.

新建100MW机组给水调节阀堵塞原因及解决措施

Causes and Solutions for Blockage of Feedwater Control Valves in Newly Built 100 MW Units

汪明宇 1张小磊 1孙玮 1宋斌斌 1李辉 1庞振振1

作者信息

  • 1. 首钢京唐钢铁联合有限责任公司,河北 唐山 063200
  • 折叠

摘要

Abstract

Addressing the blockage issue of feedwater control valves in newly built 100 MW units,the causes of blockage were analyzed,mainly including construction residue,pipeline corro-sion,oxide film shedding,control valve structural design,and operation mode.Corresponding solu-tions were proposed,including strictly controlling feedwater pH,adjusting operating pressure,regu-lar equipment cleaning,and improving the control valve structure.

关键词

100MW机组/给水调节阀/堵塞原因

Key words

100 MW unit/feedwater control valve/causes of blockage

分类

信息技术与安全科学

引用本文复制引用

汪明宇,张小磊,孙玮,宋斌斌,李辉,庞振振..新建100MW机组给水调节阀堵塞原因及解决措施[J].冶金动力,2026,(1):57-59,3.

冶金动力

1006-6764

访问量0
|
下载量0
段落导航相关论文