| 注册
首页|期刊导航|电力系统自动化|考虑碳排放约束的工业园区高耗能负荷互动决策方法

考虑碳排放约束的工业园区高耗能负荷互动决策方法

孔祥玉 于凡凡 张祖锋 周慧慧 段梅梅 方凯杰

电力系统自动化2026,Vol.50Issue(5):33-43,11.
电力系统自动化2026,Vol.50Issue(5):33-43,11.DOI:10.7500/AEPS20250307003

考虑碳排放约束的工业园区高耗能负荷互动决策方法

Interactive Decision-making Method for Energy-intensive Loads in Industrial Parks Considering Carbon Emission Constraints

孔祥玉 1于凡凡 2张祖锋 2周慧慧 3段梅梅 4方凯杰4

作者信息

  • 1. 天津市新能源电力变换传输与智能控制重点实验室(天津理工大学),天津市 300384||智能配用电装备与系统全国重点实验室(天津大学),天津市 300072
  • 2. 天津市新能源电力变换传输与智能控制重点实验室(天津理工大学),天津市 300384
  • 3. 智能配用电装备与系统全国重点实验室(天津大学),天津市 300072
  • 4. 国网江苏省电力有限公司营销服务中心,江苏省 南京市 210019
  • 折叠

摘要

Abstract

Achieving multi-dimensional load optimization and interaction with the power grid while meeting carbon constraints is a problem that energy-intensive industrial users need to solve in the energy management.Therefore,an interactive decision-making method for energy-intensive industrial loads considering load scheduling priorities and carbon emission constraints is proposed.First,starting from the three dimensions of economic benefits,environmental impact,and power system stability,a comprehensive evaluation system for load scheduling is constructed to assess the priority of energy-intensive industrial loads participating in scheduling optimization.Then,an interactive decision-making model of industrial load considering carbon emission cost is proposed,and the enhanced rime optimization algorithm is used to solve the optimization problem,achieving efficient solution and accuracy improvement.The case analysis verifies that the proposed method can effectively reduce the scheduling cost of industrial parks in typical peak-shaving scenarios,and guide energy-intensive industries to reduce carbon emissions.

关键词

高能耗工业负荷/工业园区/负荷调度/综合评价体系/碳排放/能量管理/互动决策/雾凇优化算法

Key words

energy-intensive industrial load/industrial park/load scheduling/comprehensive evaluation system/carbon emission/energy management/interactive decision-making/rime optimization algorithm

引用本文复制引用

孔祥玉,于凡凡,张祖锋,周慧慧,段梅梅,方凯杰..考虑碳排放约束的工业园区高耗能负荷互动决策方法[J].电力系统自动化,2026,50(5):33-43,11.

基金项目

国家电网公司科技项目(5400-202418217A-1-1-ZN). This work is supported by State Grid Corporation of China(No.5400-202418217A-1-1-ZN). (5400-202418217A-1-1-ZN)

电力系统自动化

1000-1026

访问量0
|
下载量0
段落导航相关论文