东北水利水电2026,Vol.44Issue(3):1-3,41,4.
混凝土缓降装置在抽水蓄能电站斜井衬砌中的应用
Application of concrete controlled descent devices in inclined shaft lining of pumped storage power stations
石春 1徐新宇2
作者信息
- 1. 华电靖宇抽水蓄能有限公司,吉林白山 135299
- 2. 中电建建筑集团有限公司,北京 100120
- 折叠
摘要
Abstract
A high-head pumped storage power station is equipped with four long steeply-inclined shafts in its water conveyance system,which are lined with steel pipes.In accordance with the engineering structure and actual site conditions,the paper develops a brand-new charging and distribution device for inclined shaft concrete mixture.The targeted optimization and improvement are conducted on the device in response to problems arising during construction,and the achieved achievements can provide valuable technical references for concrete construction of similar inclined shaft projects.关键词
陡倾角/长斜井/质量控制/混凝土/运输装置Key words
steep dip/long inclined shaft/quality control/concrete/transportation device分类
建筑与水利引用本文复制引用
石春,徐新宇..混凝土缓降装置在抽水蓄能电站斜井衬砌中的应用[J].东北水利水电,2026,44(3):1-3,41,4.