盾构磨桩穿越秦淮河堤防稳定性分析

甄峰 王茂枚 许荔 徐毅 徐铭

江苏水利Issue(3):30-34,5.
江苏水利Issue(3):30-34,5.

盾构磨桩穿越秦淮河堤防稳定性分析

Analysis of stability of Qinhuai River Levee during shield crossing with pile grinding

甄峰 1王茂枚 2许荔 1徐毅 2徐铭1

作者信息

  • 1. 江苏省水利工程科技咨询股份有限公司,江苏 南京 210029
  • 2. 江苏省水利科学研究院,江苏 南京 210017
  • 折叠

摘要

Abstract

Shield tunneling in the section from Baiyunting Station to Sanchahe Station of Nanjing Metro Line 9 passes through the anti-slide piles and levee on the south bank of the Qinhuai River with pile grinding.To evaluate the influence of shield pile grinding excavation on the safety of the Qinhuai River levee project,a refined 3D numerical model considering the interaction among the levee with anti-slide piles,strata,and shield tunnel is established using Plaxis 3D finite element software.The effects of different ground loss rates on levee deformation and global stability are analyzed.The results show that by adopting measures such as high pressure jet grouting pile reinforcement and tunneling parameter control,levee crest settlement can be controlled within 10 mm,and the safety stability factor of the levee is significantly improved.

关键词

盾构磨桩/秦淮河/堤防变形/堤防稳定性

Key words

shield pile grinding/Qinhuai River/dike deformation/dike stability

分类

建筑与水利

引用本文复制引用

甄峰,王茂枚,许荔,徐毅,徐铭..盾构磨桩穿越秦淮河堤防稳定性分析[J].江苏水利,2026,(3):30-34,5.

基金项目

江苏省水利科技项目(2024001) (2024001)

江苏水利

1007-7839

访问量0
|
下载量0
段落导航相关论文