| 注册
首页|期刊导航|矿产保护与利用|基于蝶形破坏理论的巷道围岩变形破坏规律研究

基于蝶形破坏理论的巷道围岩变形破坏规律研究

张华超 王智能 夏钢源 黄杰 袁明礼 刘聘

矿产保护与利用2026,Vol.46Issue(1):78-86,9.
矿产保护与利用2026,Vol.46Issue(1):78-86,9.DOI:10.13779/j.cnki.issn1001-0076.2026.03.007

基于蝶形破坏理论的巷道围岩变形破坏规律研究

Research on the Deformation and Failure Law of Surrounding Rock in Tunnels Based on Butterfly Failure Theory

张华超 1王智能 1夏钢源 2黄杰 2袁明礼 2刘聘2

作者信息

  • 1. 云南磷化集团有限公司,云南 昆明 650600
  • 2. 云南磷化集团有限公司,云南 昆明 650600||国家磷资源开发利用工程技术研究中心,云南 昆明 650600
  • 折叠

摘要

Abstract

The stability of surrounding rock in tunnels is a core scientific issue in underground mining engineering practices.In order to study the deformation and failure laws of surrounding rock in tunnels,this paper explores the action mechanisms of maximum principal stress,minimum principal stress,vertical plane stress,and maximum principal stress angle on the butterfly-shaped failure of tunnels,systematically reveals the mechanical evolution mechanism of butterfly-shaped failure of tunnels,and analyzes the deformation laws of surrounding rock under the influence of various changing factors based on the butterfly-shaped failure theory through numerical models.The results show that the size of butterfly blades in the butterfly-shaped plastic zone is positively correlated with the magnitude of stress applied.With the continuous increase of principal stress,compressive shear plastic zone exhibits significant convergence,and the distance between its geometric center and the tunnel boundary is negatively exponentially related to the principal stress,but with the plastic zone formed by tensile stress further expanding in the original direction.The impact of maximum principa stress on the displacement of surrounding rock is the greatest while that of minimum principal stress is the least.With the increase of maximum principal stress from 12 MPa to 50 MPa,the maximum displacement of surrounding rock increases from 0.098 m to 0.76 m,accompanied by a gradual increase in the displacement of left and right arch waists,arch crown,and arch bottom of the tunnel from the endpoints on both sides to the middle.The deviation of maximum principal stress azimuth triggers the counterclockwise rotation of the main extension axis of the plastic zone,without forming a complete butterfly blade.As plane stress is continually vertically applied,surrounding rock presents a self-organized equilibrium response,with a symmetrical equilibrium state formed between the compressive shear zone and tension fracture zone under the synergistic action of bidirectional stress.The shear stress at the junction of the arch crown and the two sides suddenly changes,and the left and right sides are respectively subjected to compressive stress and tensile stress.

关键词

蝶形破坏理论/巷道围岩/塑性区变形/应力变化/数值模拟

Key words

butterfly shaped destruction theory/surrounding rock of roadway/plastic deformation zone/stress variation/numerical simulation

分类

矿业与冶金

引用本文复制引用

张华超,王智能,夏钢源,黄杰,袁明礼,刘聘..基于蝶形破坏理论的巷道围岩变形破坏规律研究[J].矿产保护与利用,2026,46(1):78-86,9.

基金项目

云南省磷资源技术创新中心项目(202305AK340002) (202305AK340002)

矿产保护与利用

1001-0076

访问量0
|
下载量0
段落导航相关论文