四川水力发电2026,Vol.45Issue(1):53-58,87,7.DOI:10.20196/j.cnki.scslfd.20260111
某高流速大泄量溢洪洞出口挑坎基础处理研究
Research on foundation treatment of the flip bucket at the outlet of a high-flow,large-discharge spillway tunnel
谢桃 1周涛 1肖玉会 1柴瑞1
作者信息
- 1. 四川省清源工程咨询有限公司,四川 成都 610072
- 折叠
摘要
Abstract
Approximately 80%of the flip bucket foundation at the spillway tunnel outlet of the Bala Hydropow-er Project is situated on a deep overburden layer.Through numerical analysis methods and considering con-struction conditions,structural reliability,and project investment,four schemes-excavation and backfilling,pile foundation,slurry trench wall with frame structure,and overburden consolidation grouting-were analyzed and studied.The most scientifically sound and reasonable treatment method,which best aligns with the project's characteristics,was selected,providing valuable references for the foundation treatment of similar hydraulic structures.关键词
巴拉水电站/挑坎基础/覆盖层/开挖回填Key words
Bala Hydropower Project/flip bucket foundation/overburden/excavation and backfilling分类
交通工程引用本文复制引用
谢桃,周涛,肖玉会,柴瑞..某高流速大泄量溢洪洞出口挑坎基础处理研究[J].四川水力发电,2026,45(1):53-58,87,7.