摘要

Abstract

Approximately 80%of the flip bucket foundation at the spillway tunnel outlet of the Bala Hydropow-er Project is situated on a deep overburden layer.Through numerical analysis methods and considering con-struction conditions,structural reliability,and project investment,four schemes-excavation and backfilling,pile foundation,slurry trench wall with frame structure,and overburden consolidation grouting-were analyzed and studied.The most scientifically sound and reasonable treatment method,which best aligns with the project's characteristics,was selected,providing valuable references for the foundation treatment of similar hydraulic structures.

关键词

巴拉水电站/挑坎基础/覆盖层/开挖回填

Key words

Bala Hydropower Project/flip bucket foundation/overburden/excavation and backfilling

分类

交通工程