苍村水库溢洪道出险原因分析及除险加固措施

李小龙 陈小丹 李远辉 朱思军

广东水利水电Issue(3):23-28,34,7.
广东水利水电Issue(3):23-28,34,7.

苍村水库溢洪道出险原因分析及除险加固措施

Analysis of the Spillway Failure Causes and Risk Removal and Reinforcement Measures for Cangcun Reservoir

李小龙 1陈小丹 1李远辉 1朱思军1

作者信息

  • 1. 广东省水利水电科学研究院,广州 510635||广东省岩土工程技术研究中心,广州 510635
  • 折叠

摘要

Abstract

Qujiang district suffered three consecutive heavy rainfall events.After nearly six days of continuous flood discharge through the spillway of Cangcun reservoir,a collapse hazard occurred in the downstream floor of the spillway.Calculations and analyses based on geological surveys,geological radar and core detection results,and design drawings revealed the main causes of the spillway failure:Under extreme conditions such as heavy rain and high water levels,reservoir water infiltrated downstream through geological faults and soil beneath the floor,gradually eroding fine particles to form seepage channels,which led to floor voiding.Eventually,the floor failed under the combined action of uplift pressure and pulsating pressure.This analysis of the spillway failure causes and the proposed risk removal and reinforcement measures can provide references for similar engineering projects.

关键词

水库/溢洪道/垮塌险情/除险加固

Key words

reservoir/spillway/collapse hazard/risk elimination and reinforcement