四川水力发电2026,Vol.42Issue(3):45-49,59,6.DOI:10.20196/j.cnki.scslfd.20260310
山地丘陵光储项目施工监理质量控制研究
Research on quality control of construction supervision for mountainous and hilly photovoltaic storage projects——Taking the Xiyang Project in Shanxi Province as an example
张亚辉1
作者信息
- 1. 四川能达工程咨询有限公司,四川 成都 610066
- 折叠
摘要
Abstract
The mountainous and hilly photovoltaic storage projects,due to its complex terrain,scattered con-struction sites,and multi-disciplinary cross-operation,have become a key and challenging area for quality con-trol in engineering supervision.Taking the Xiyang Project in Shanxi Province as the research object,combined with the mountainous and hilly terrain and high-altitude operation characteristics of the project,the supervision work contents in each stage of the entire construction process were sorted out,the key points of quality control for each section were clarified,and targeted supervision measures were proposed for typical quality problems that occurred during the construction.The research results can provide practical references for the construction supervision quality control of similar projects,and help to improve the construction quality and efficiency of mountain photovoltaic projects.关键词
山地丘陵/光储项目/施工监理/质量管控/全流程施工Key words
mountainous and hilly areas/photovoltaic storage project/construction supervision/quality control/full-process construction分类
交通工程引用本文复制引用
张亚辉..山地丘陵光储项目施工监理质量控制研究[J].四川水力发电,2026,42(3):45-49,59,6.