摘要

Abstract

Flood discharge tunnel is an important part of water conservancy and hydropower project,and the concrete construction quality of the pressure tunnel section is directly related to the safety and durability of the project.This paper mainly expounds the importance of concrete construction in the section with pressure holes,then analyzes the possible problems in the construction process,and finally proposes the corresponding control measures.The purpose of this paper is to improve the construction quality of concrete in the section with pressure cavity and ensure the safety and stability of the flood discharge tunnel.

关键词

有压洞段/施工质量/控制措施

Key words

pressure section of the tunnel/construction quality/control measures