| 注册
首页|期刊导航|四川水力发电|红石岩堰塞湖整治工程电站新投运工作组织与管理

红石岩堰塞湖整治工程电站新投运工作组织与管理

宁季国

四川水力发电2026,Vol.42Issue(3):159-162,4.
四川水力发电2026,Vol.42Issue(3):159-162,4.DOI:10.3969/j.issn.1006-3951.2026.03.041

红石岩堰塞湖整治工程电站新投运工作组织与管理

Organization and Management of the New Operation of Power Station in Hongshiyan Barrier Lake Remediation Project

宁季国1

作者信息

  • 1. 云南水投牛栏江堰塞湖工程建设有限公司,云南 昭通 657000
  • 折叠

摘要

Abstract

Through the organization and management of the successful completion of the grid connection work of the Niulanjiang Hongshiyan Barrier Lake Remediation Project hydropower station,this paper summarizes the key issues,processes,and nodes during the unit commissioning process.It provides a comprehensive and systematic summary from the perspective of power generation enterprises in terms of internal organization and external coordination and management during the new operation process,which can solve the management pain points of the transition from engineering construction to production and operation of integrated hydropower projects,enabling the smooth operation of power stations and providing experience and reference for the operation of new hydropower projects.

关键词

水电站/红石岩堰塞湖/新投/管理

Key words

hydropower station/Hongshiyan barrier lake/new operation/management

分类

建筑与水利

引用本文复制引用

宁季国..红石岩堰塞湖整治工程电站新投运工作组织与管理[J].四川水力发电,2026,42(3):159-162,4.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文