煤炭与化工2026,Vol.49Issue(3):55-60,65,7.DOI:10.19286/j.cnki.cci.2026.03.012
深部煤层底板高承压含水层水害全周期治理技术研究
Research on full-cycle control technology of water disaster in high confined aquifer of deep coal seam floor
刘志勇1
作者信息
- 1. 冀中能源峰峰集团邯郸宝峰矿业有限公司九龙矿,河北邯郸 056200
- 折叠
摘要
Abstract
Aiming at the problem of water disaster prevention and control in confined aquifer of deep coal seam mining,based on the geological and hydrogeological conditions of Jiulong Mine,the mechanism of water outburst disaster in high confined aquifer of coal seam floor was comprehensively analyzed,and the full-cycle three-dimensional control technology was summarized according to the characteristics of water outburst such as high water pressure in deep coal seam,etc.The results showed that for the deep mining face with structure,the pre-mining three-dimensional drainage regional control,the safety monitoring and key reinforcement of the weak area during mining,and the post-mining reinforcement grouting,which improved the safety of mining,and realized water-reducing mining and harmless mining above deep high confined aquifer.The study had reference significance for coal seam mining under similar conditions.关键词
深部开采/突水致灾机理/全周期防控/区域治理/引流注浆Key words
deep mining/the mechanism of water outburst disaster/whole-cycle prevention and control/regional control/drainage grouting分类
矿业与冶金引用本文复制引用
刘志勇..深部煤层底板高承压含水层水害全周期治理技术研究[J].煤炭与化工,2026,49(3):55-60,65,7.