人民长江2026,Vol.57Issue(3):77-84,8.DOI:10.16232/j.cnki.1001-4179.2026.03.010
金沙江下游-三峡梯级水库2024年汛期调度成效分析
Analysis on joint operation of lower Jinsha River and Three Gorges cascade reservoirs in 2024 flood season
摘要
Abstract
To further enhance the joint operation capability of the cascade reservoirs on the lower Jinsha River and the Three Gorges Dam,and to improve the comprehensive utilization efficiency of water resources in the basin,this study conducted a retro-spective analysis on joint operation processes of the cascade reservoirs during the 2024 flood season and impoundment period.The incremental benefits of key measures—specifically,the integrated utilization of flood control storage in the lower Jinsha River cas-cade,the optimized outflow regulation of the Three Gorges Reservoir,and the coordinated optimal operation of the cascade sys-tem—were quantified.The results show that in response to the complex hydrological conditions(i.e.,"drought-flood abrupt al-ternation")during the 2024 flood season and under the scientific guidance of the Changjiang Water Resources Commission of the Ministry of Water Resources,the cascade reservoirs successfully managed three numbered floods.A total of 13.45 billion m3 of floodwater was intercepted during the main flood season,thereby robustly ensuring flood control safety.Through refined operations during the impoundment period,the usable water volume of the cascade reservoirs reached 33.3 billion m3 by the end of Decem-ber,2.7 billion m3 more than the same period in 2023,laying a solid foundation for water supply in the dry season.Furthermore,compared to standard operational procedures,the joint scheduling reduced water abandonment by 8.3 billion m3 and increased power generation by7.3 billion kW·h,significantly improving beneficial effects.The joint optimal scheduling practices of the cascade reservoirs in 2024 provide valuable references for optimizing operational strategies of basin-wide reservoir systems and a-chieving multi-objective collaborative regulation.关键词
金沙江下游/三峡水库/联合调度/反演分析/防洪效益Key words
lower Jinsha River/Three Gorges Reservoir/joint operation/inversion analysis/flood control benefits分类
建筑与水利引用本文复制引用
朱文丽,李帅,谭政宇,曹瑞,张松,龚文婷..金沙江下游-三峡梯级水库2024年汛期调度成效分析[J].人民长江,2026,57(3):77-84,8.基金项目
国家自然科学基金长江水科学研究联合基金项目(U2340205) (U2340205)
国家自然科学基金青年基金项目(52109024) (52109024)
中国长江三峡集团有限公司员工科研项目(NBYG202300676) (NBYG202300676)