高地应力深埋地下洞室开挖卸荷围岩力学响应研究

谢聪 周鸿轲 吴述彧 李鹏飞

人民长江2026,Vol.57Issue(3):165-172,179,9.
✕
人民长江2026,Vol.57Issue(3):165-172,179,9.DOI:10.16232/j.cnki.1001-4179.2026.03.020

高地应力深埋地下洞室开挖卸荷围岩力学响应研究

Study on mechanical response of surrounding rock under excavation unloading in deeply buried underground caverns with high geostress

谢聪 1周鸿轲 2吴述彧 1李鹏飞1

作者信息

  • 1. 中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081
  • 2. 中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081||成都理工大学 地质灾害防治与地质环境保护全国重点实验室,四川 成都 610059
  • 折叠

摘要

Abstract

In recent years,large-scale hydropower projects in China have mostly been constructed in the high mountain and canyon regions of the southwest.These projects are characterized by significant elevation differences,strong unloading effects,and high in-situ stresses,which frequently lead to deformation and failure of the surrounding rock in underground caverns.Taking the under-construction RM Hydropower Station on the Lancang River as a case study,this paper systematically analyzes the basic characteristics and patterns of deformation and failure in the surrounding rock of the diversion tunnel,based on geological data and test results.Numerical simulation was employed to study the deformation,stress evolution,and plastic zone distribution characteris-tics of the surrounding rock during layered excavation,and the deformation and failure mechanism induced by excavation unloa-ding was further analyzed.The results showed that the deformation and failure of the surrounding rock were mainly concentrated in the arch shoulder on the riverside,which was attributed to the combined action of the structural plane and high in-situ stress.During the layered excavation process,significant stress concentration occurred in the surrounding rock of the arch shoulder.The maximum principal stress reached approximately 70 MPa,the failure depth was less than 50 cm,and the failure zone was charac-terized by a"large range and shallow depth".The research results can provide technical reference for the excavation and support design of deep buried large underground powerhouses in similar regions.

关键词

深埋隧洞/高地应力/开挖卸荷/变形破坏机制/数值模拟/澜沧江

Key words

deep buried tunnel/high geostress/excavation unloading/deformation and failure mechanism/numerical simula-tion/Lancang River

分类

建筑与水利

引用本文复制引用

谢聪,周鸿轲,吴述彧,李鹏飞..高地应力深埋地下洞室开挖卸荷围岩力学响应研究[J].人民长江,2026,57(3):165-172,179,9.

基金项目

国家自然科学基金项目(42293353) (42293353)

国家博士后研究人员计划项目(GZC20240167) (GZC20240167)