中国电网交流励磁变速抽水蓄能机组首次建设与运行

The First-time Construction and Operation of AC-excited Variable-speed Pumped Storage Units in China's Power Grid

吴培枝 1王英伟 1穆良 1杨梅 2张昊晟 2王建明 2王纯 2付晓娣2

作者信息

  • 1. 国网新源集团有限公司,北京 100052||国网新源河北丰宁抽水蓄能有限公司,河北 承德 068350
  • 2. 中国电建集团北京勘测设计研究院有限公司,北京 100024
  • 折叠

摘要

Abstract

Fengning Pumped Storage Power Station is the first time in China to apply and construct two AC-excited variable-speed generating units,and is also the first time to go through the entire process from feasibility study,tender document preparation,main equipment contract negotiation and execution,on-site installation and testing to operation.This paper briefly introduces the construction necessity,system design,equipment design and manufacturing,and some key technologies during the installation process of the variable-speed units.It particularly analyzes the relevant data of variable-speed unit operating in Chinese power grid.Through engineering practice,the performance advantages of variable-speed units have been verified,which can provide reference and guidance for the design,manufacturing,installation,testing and operation of variable-speed units in the future.

关键词

首次/抽水蓄能电站/交流励磁变速机组/设计制造/安装/运行

Key words

first time/pumped-storage power station/AC-excited variable-speed unit/design and manufacture/installation/operation

分类

信息技术与安全科学

引用本文复制引用

吴培枝,王英伟,穆良,杨梅,张昊晟,王建明,王纯,付晓娣..中国电网交流励磁变速抽水蓄能机组首次建设与运行[J].水力发电,2026,52(4):73-83,11.

基金项目

国网新源集团有限公司科技项目资助(SGXYKJ-2019-074) (SGXYKJ-2019-074)

水力发电

0559-9342

访问量0
|
下载量0
段落导航相关论文