扩能提升工程信号系统折返能力的分析与探讨

王森

铁路通信信号工程技术2026,Vol.23Issue(3):98-103,6.
铁路通信信号工程技术2026,Vol.23Issue(3):98-103,6.DOI:10.3969/j.issn.1673-4440.2026.03.015

扩能提升工程信号系统折返能力的分析与探讨

Analysis and Discussion on Turnback Capability of Signaling System in Capacity Expansion and Enhancement Projects

王森1

作者信息

  • 1. 中铁通信信号勘测设计院有限公司,北京 100036
  • 折叠

摘要

Abstract

The station turnback capacity refers to the maximum number of trains that can turn back at a turnback station per hour.The carrying capacity of urban rail transit is influenced by various factors,including the station turnback capacity.The capacity expansion and enhancement projects aim to increase transport capacity by increasing the traffic density,making the station turnback capacity a critical factor constraining the final outcome of capacity expansion and enhancement.This paper dissects the train turnback process in the capacity expansion and enhancement project of Beijing Rail Transit Line 13,and analyzes changes in turnback times under different turnback conditions.Through parameter optimization and condition comparison,as well as simulation calculation,this study verifies that,under certain conditions,the capacity expansion and enhancement project can improve the signaling system's turnback capacity,thereby achieving the target of capacity expansion and enhancement.It also preliminarily reveals the characteristics of train turnback during capacity expansion and enhancement projects,as well as methods for calculating and optimizing turnback capacity.

关键词

城市轨道交通/折返能力/扩能提升/信号系统/行车组织

Key words

urban rail transit/turnback capacity/capacity expansion and enhancement/signaling system/train operation organization