陕西水利Issue(3):57-59,67,4.
梅溪流域"尼伯特"台风暴雨洪水过程复盘分析
Reconstruction Analysis of the"Nepartak"Typhoon Flood Process in the Meixi Basin
黄义辉 1武晶 1赵思源 2林相颍2
作者信息
- 1. 福建省水文水资源勘测局闽江河口水文实验站,福建 福州 350001
- 2. 福州大学土木工程学院,福建 福州 350108
- 折叠
摘要
Abstract
Mountain floods rise rapidly and recede sharply,often causing severe losses.Accurate flood forecasting is therefore vital for disaster mitigation.The Meixi Basin in Minqing County,Fujian Province,was selected as the study area,and a coupled hydrological-hydrodynamic model was developed.Data from the 2023"Haikui"and 2015"Soudelor"typhoon events were used for model calibration and validation,after which the flood process caused by Typhoon"Nepartak"on 9 July 2016 was reconstructed.Results show that the model reproduces hydrodynamic characteristics of the main channel well,with reasonable parameter settings,providing technical support and an analytical platform for flash-flood early warning and forecasting.关键词
水文-水动力耦合模型/山洪/"尼伯特"台风/暴雨洪水过程/复盘分析Key words
Hydrological-hydrodynamic coupling/mountain floods/Typhoon Nepartak/heavy rain flood process/review analysis分类
建筑与水利引用本文复制引用
黄义辉,武晶,赵思源,林相颍..梅溪流域"尼伯特"台风暴雨洪水过程复盘分析[J].陕西水利,2026,(3):57-59,67,4.