| 注册
首页|期刊导航|铁道运输与经济|200 km/h客货共线线路动货交会集装箱装载稳定性研究

200 km/h客货共线线路动货交会集装箱装载稳定性研究

马玉坤 李涵 陈波 陈光 熊小慧

铁道运输与经济2026,Vol.48Issue(4):84-96,13.
铁道运输与经济2026,Vol.48Issue(4):84-96,13.DOI:10.16668/j.cnki.issn.1003-1421.20251209002

200 km/h客货共线线路动货交会集装箱装载稳定性研究

Research on Container Loading Stability During Meeting Operations Between EMUs and Freight Trains on 200 km/h Mixed Passenger-Freight Railway

马玉坤 1李涵 1陈波 2陈光 2熊小慧2

作者信息

  • 1. 中国铁道科学研究院集团有限公司 运输及经济研究所,北京 100081
  • 2. 中南大学 交通运输工程学院,湖南 长沙 410075||中南大学 轨道交通安全教育部重点实验室,湖南 长沙 410075||中南大学 轨道交通列车安全保障技术国家地方联合工程研究中心,湖南 长沙 410075
  • 折叠

摘要

Abstract

To verify the safety of meeting operations between electric multiple units(EMUs)and container trains on 200 km/h mixed passenger-freight railways,this paper investigated container loading stability based on real train tests on the Kunming-Chuxiong-Dali Line,focusing on straight tunnel scenarios.Aerodynamic pressure and acceleration data were monitored to analyze the variations in aerodynamic lateral force,lift force,and acceleration of containers during meeting operations.The overturning stability and horizontal movement stability were verified with reference to the Railway Freight Loading Reinforcement Rules.The results show that the transverse overturning stability of 20 ft containers is generally better than that of 40 ft containers.Under the maximum meeting speeds of 200 km/h and 120 km/h,the transverse overturning stability of containers under different loading conditions meets safety requirements.The structural strength of FT-R locks is verified by calculation,and the results satisfy the requirements for horizontal movement stability.The main factors affecting the aerodynamic load on containers are the meeting speed and the EMU type,while the variation in the container train's running speed has little influence on the aerodynamic lateral force.Compared with distributed power EMUs,the aerodynamic lateral force on containers is greater when meeting concentrated power EMUs.The research results can provide empirical support for meeting operations between EMUs and freight trains on 200 km/h mixed passenger-freight railways and offer a reference for the safety and operational optimization of high speed rail freight.

关键词

客货共线线路/动车组/集装箱装载稳定性/列车交会/实车试验/气动载荷

Key words

Mixed Passenger-Freight Railway/Electric Multiple Unit/Container Loading Stability/Train Meeting/Real Train Test/Aerodynamic Load

分类

交通工程

引用本文复制引用

马玉坤,李涵,陈波,陈光,熊小慧..200 km/h客货共线线路动货交会集装箱装载稳定性研究[J].铁道运输与经济,2026,48(4):84-96,13.

基金项目

中国国家铁路集团有限公司科技研究开发计划课题(P2024X007) (P2024X007)

铁道运输与经济

1003-1421

访问量0
|
下载量0
段落导航相关论文