High-Speed Railway2026,Vol.4Issue(1):P.41-47,7.DOI:10.1016/j.hspr.2025.10.002
Estimated carrying capacity based on different signal types for Vietnam's high-speed railway plan
Thai Nguyen 1Hong Le Xuan 1Dong Doan Van1
作者信息
- 1. BRIDGE Research Group,Ho Chi Minh City University of Transport,Ho Chi Minh City 70000,Vietnam
- 折叠
摘要
关键词
Headway/Line capacity/High-speed railway/Signal control/ERTMS/ETCS分类
交通工程引用本文复制引用
Thai Nguyen,Hong Le Xuan,Dong Doan Van..Estimated carrying capacity based on different signal types for Vietnam's high-speed railway plan[J].High-Speed Railway,2026,4(1):P.41-47,7.