| 注册
首页|期刊导航|中外公路|浅山丘陵地区变截面空心薄壁高墩液压爬模结构力学特性研究

浅山丘陵地区变截面空心薄壁高墩液压爬模结构力学特性研究

王成业 刘传起 李磊 梁斌 李文杰

中外公路2026,Vol.46Issue(2):134-144,11.
中外公路2026,Vol.46Issue(2):134-144,11.DOI:10.14048/j.issn.1671-2579.2026.02.015

浅山丘陵地区变截面空心薄壁高墩液压爬模结构力学特性研究

Study on Mechanical Characteristics of Hydraulic Climbing Formwork Structure for Variable Cross-Section Hollow Thin-Walled High Piers in Shallow Hilly Areas

王成业 1刘传起 2李磊 3梁斌 2李文杰2

作者信息

  • 1. 中交二公局第四工程有限公司,河南 洛阳 471013||河南科技大学 土木建筑学院,河南 洛阳 471000
  • 2. 河南科技大学 土木建筑学院,河南 洛阳 471000
  • 3. 中交二公局第四工程有限公司,河南 洛阳 471013
  • 折叠

摘要

Abstract

To address the problems of severe damage to the pier concrete caused by wall attachments of components such as guide rails and low climbing efficiency in traditional hydraulic climbing formwork construction,a new type of hydraulic climbing formwork structure suitable for the construction of variable cross-section hollow thin-walled high piers was designed based on the Miaolu River Bridge project of the Zhengzhou‒Luoyang Expressway in this paper.To ensure the safety of the structure during construction,a finite element model of the climbing formwork structure was established using Midas Civil;the stress and deformation of components such as formwork,climbing formwork frame,operation platform,and support bracket were analyzed,and the stability of the structure was checked.The results show that the maximum combined stress of the formwork panel is 16.85 MPa;the maximum combined stresses of the transverse and vertical ribs are 89.18 MPa and 153.52 MPa,respectively;the maximum deformations of the formwork structure are 4.60 mm and 3.68 mm;both the stress and deformation meet the requirements.The maximum stresses of the climbing formwork frame and the operation platform are 162.16 MPa and 122.97 MPa,respectively,which are both less than the yield strength of Q235B steel;the maximum deformations are 7.63 mm and 7.98 mm,meeting the requirements.The support brackets are anchored to the pier body through bolts.The stability and safety factor are checked according to the maximum reaction force values at the connection points between the brackets and the pier body when the climbing of the climbing formwork structure is completed,and the results all meet the specification requirements.In the actual construction process,the climbing of the new hydraulic climbing formwork structure is completed by four vertical hydraulic jacks set on the support brackets,which is simpler and easier to operate and improves the construction efficiency.

关键词

空心薄壁高墩/液压爬模结构/浅山丘陵/变截面/力学特性/施工技术

Key words

hollow thin-walled high pier/hydraulic climbing formwork structure/shallow hilly area/variable cross-section/mechanical characteristic/construction technology

分类

交通工程

引用本文复制引用

王成业,刘传起,李磊,梁斌,李文杰..浅山丘陵地区变截面空心薄壁高墩液压爬模结构力学特性研究[J].中外公路,2026,46(2):134-144,11.

基金项目

国家自然科学基金资助项目(编号:U1604135) (编号:U1604135)

中交第二公路局有限公司科研项目(编号:RP2023023313) (编号:RP2023023313)

河南省科技厅产学研合作项目(编号:2015HNCXY011) (编号:2015HNCXY011)

中外公路

1671-2579

访问量0
|
下载量0
段落导航相关论文