河南水利与南水北调2026,Vol.55Issue(3):45-46,2.
橡胶坝底板锚固技术常见问题及优化对策
Common Problems and Optimization Measures of Rubber Dam Base Plate Anchoring Technology
丁清伟1
作者信息
- 1. 南阳市白河橡胶坝运行保障中心,河南 南阳 473000
- 折叠
摘要
Abstract
The article aims to optimize the anchoring technology of the base plate of the rubber dam,ensuring the safe and stable operation of the dam body.Focusing on core issues such as force transmission and bearing capacity,sealing and seepage prevention,as well as fixation and positioning,the principle of'prevention first,combined with control'was proposed.Countermeasures were formulated from four dimensions:material upgrading,structural optimization,construction control,and operation and maintenance strengthening,to achieve precise problem handling and long-term prevention and control.The results show that the reliability and durability of the optimized base plate anchoring system have been significantly improved,ensuring the safe operation of the rubber dam.关键词
橡胶坝/底板/锚固/问题/对策Key words
rubber dam/base plate/anchorage/problems/countermeasures分类
建筑与水利引用本文复制引用
丁清伟..橡胶坝底板锚固技术常见问题及优化对策[J].河南水利与南水北调,2026,55(3):45-46,2.