建筑设计管理2026,Vol.43Issue(3):38-44,50,8.DOI:10.3969/j.issn.1673-1093.2026.03.005
面向设计企业的EPC+O项目智慧投标与全周期成本管控模型构建
Smart Bidding and Full Life Cycle Cost Control Model for EPC+O Projects Oriented for Design Enterprises
梁森1
作者信息
- 1. 宝武水务科技有限公司,上海 201900
- 折叠
摘要
Abstract
To improve the efficiency of resource allocation,strictly control construction and operational costs,and reduce management risks in the interface between the construction and operation phases,project owners generally adopt the EPC+O model for tendering projects characterized by high process complexity,large investment and construction scale,and demanding operational requirements.Taking a coking wastewater zero-discharge project as an example,this paper establishes a cost control indicator system based on the characteristics of such projects,elaborates in detail on the content and functions of the smart bidding and full life cyole cost control model,and finally discusses the application scenarios of this model.This smart bidding and full life cycle cost control model is applicable to projects tendered under the EPC+O model.It also aids design enterprises in promoting digital transformation and enhancing their bidding success rate and cost management performance.关键词
EPC+O/智慧投标与成本管控模型/全生命周期/最优成本Key words
EPC+O/smart bidding and cost control model/full life cycle/optimal cost分类
建筑与水利引用本文复制引用
梁森..面向设计企业的EPC+O项目智慧投标与全周期成本管控模型构建[J].建筑设计管理,2026,43(3):38-44,50,8.