水平定向钻穿越PE管最大允许回拖长度探讨
Discussion on Maximum Allowable Pullback Length of PE Pipes in Horizontal Directional Drilling Crossing
钟立 1张宪文1
作者信息
- 1. 佛山市华禅能燃气设计有限公司,广东 佛山 528000
- 折叠
摘要
Abstract
The calculation of the maximum allowable pullback force and the maximum allowable pullback length of PE pipes in horizontal directional drilling(HDD)crossing is discussed.Based on the calculation formula for maximum allowable pullback force speci-fied in Technical Standard for Polyethylene(PE)Gas-eous Fuel Pipeline Engineering(CJJ 63-2018),a re-vised calculation formula is proposed.When the nomi-nal outer diameter of a PE pipe is less than or equal to 110 mm,the maximum allowable pullback length is less than 300 m;when it is greater than or equal to 160 mm,the length exceeds 300 m.The maximum allow-able pullback length of PE pipes increases with their nominal outer diameter.关键词
水平定向钻穿越/最大允许拖拉力/最大允许回拖长度Key words
horizontal directional drilling/maximum al-lowable pullback force/maximum allowable pullback length分类
建筑与水利引用本文复制引用
钟立,张宪文..水平定向钻穿越PE管最大允许回拖长度探讨[J].煤气与热力,2026,46(4):52-53,2.