龚嘴水库坝前减淤调度的入库流量控制指标

Inflow control indicators of sediment reduction operation in front of the dam of Gongzui Reservoir

周佳 1谢益芹 2王党伟 2邓安军 2史红玲2

作者信息

  • 1. 国能大渡河流域水电开发有限公司龚嘴水力发电总厂,四川 乐山 614905
  • 2. 中国水利水电科学研究院流域水循环与水安全全国重点实验室,北京 100048||中国水利水电科学研究院水利部泥沙科学与北方河流治理重点实验室,北京 100048
  • 折叠

摘要

Abstract

The construction of the Pubugou hydropower station has caused erosion and deposition changes in Gongzui Reservoir,which has essentially reached the erosion-deposition balance.The impact of the operation and regulation mode on the erosion and deposition evolution of Gongzui Reservoir as well as the inflow control indicators of sediment reduction operation are examined in order to encourage sedimentation reduction of the reservoir in front of the dam. Based on the inflow water and sediment data from Shaping hydrological station,the changing trend of the runoff and sediment and the water and sediment situation of Gongzui Reservoir are analyzed,and the three typical water and sediment processes,namely abundant,flat,and dry,are determined.The two-dimensional mathematical model of water and sediment of Gongzui Reservoir is established,and it is verified that the model can accurately simulate the hydrodynamic process and the erosion and deposition distribution of Gongzui Reservoir by comparing it with the measured data.The erosion and deposition evolution in front of dams under the different typical water and sediment conditions and different operation and regulation modes is calculated based on the two-dimensional mathematical model,and the relationship between deposition-erosion amount and inflow rate is investigated. The findings show that:in large and average water years,lowering the water level at the right time helps reduce sedimentation in front of the dam;in small water years,the opposite is true.A high flow rate can wash sediment in the reservoir area toward the front of the dam.Additionally,lowering the water level aids in discharging sediment from the reservoir and helps decrease sediment buildup in front of the dam.Conversely,during small flow years,sediment cannot be discharged from the reservoir front due to insufficient hydrodynamic force,leading to sediment accumulation there.The critical flow rate for lowering the water level is 3 580 m3/s. In conclusion,using the critical flow rate for lowering water levels as the inflow control indicator in reservoir operation helps reduce sedimentation in front of the dam and does not affect normal power generation.Additionally,the current study can provide technical support for reservoir operations.

关键词

龚嘴水库/减淤/降水位/临界流量/水沙条件

Key words

Gongzui Reservoir/sediment reduction/lowering water level/critical discharge/water and sediment condition

分类

建筑与水利

引用本文复制引用

周佳,谢益芹,王党伟,邓安军,史红玲..龚嘴水库坝前减淤调度的入库流量控制指标[J].南水北调与水利科技(中英文),2026,24(2):313-322,10.

基金项目

国家自然科学基金项目(U22A20237) (U22A20237)

国家能源集团科技创新项目(GJNY-DDH-2023-012) (GJNY-DDH-2023-012)

南水北调与水利科技(中英文)

2096-8086

访问量1
|
下载量0
段落导航相关论文