摘要

Abstract

To address the scheduling issues caused by the instability of wind and photovoltaic outputs in DC transmission systems,a coordinated optimal scheduling method for wind-photovoltaic-thermal-storage DC systems integrating multi-time-scale optimization and adaptive robust optimization was proposed.A two-stage coordinated optimal scheduling model for wind-photovoltaic-thermal-storage DC systems was established with the objective of maximizing comprehensive benefits,including economic,environmental,system and flexibility benefits,subject to constraints such as power balance and energy storage state of charge(SOC).In the day-ahead planning stage,the objective function and constraints were established,and the multi-objective problem was solved using the non-dominated sorting genetic algorithm Ⅱ.In the intraday rolling optimization stage,a deviation set describing the uncertainty of wind and photovoltaic outputs was constructed,and a min-max robust optimization method was employed.The model was solved using the column-and-constraint generation algorithm to ensure that transmission power met medium-and long-term DC transmission plans under extreme conditions.The simulation results demonstrated that the proposed strategy achieved the lowest comprehensive cost under scenario 4,which was approximately 7%lower than that under scenario 1.The fluctuation amplitude of medium-and long-term transmission power reduced by more than 30%.After intraday rolling optimization,the tracking error of the transmission power was controlled within 2%,and the robust optimization model still obtained a globally optimal solution satisfying hard constraints under the worst-case scenario.The proposed scheduling strategy can maximize comprehensive benefits in the DC transmission systems of new energy bases,ensuring that real-time transmission power closely tracks medium and long-term transmission plans.Furthermore,the robust optimization model can still obtain a globally optimal solution satisfying hard constraints even when considering uncertainty scenarios under the worst-case scenario.

关键词

新能源/直流外送系统/多时间尺度/综合效益最大化/非支配排序遗传算法Ⅱ/自适应鲁棒优化/列与约束生成算法

Key words

new energy/DC transmission system/multi-time scale/comprehensive benefit maximization/non-dominated sorting genetic algorithm Ⅱ/adaptive robust optimization/column-and-constraint generation algorithm

分类

能源科技

引用本文复制引用

王启玺,韩自奋,刘克权,董海鹰..新能源基地直流外送系统多时间尺度鲁棒协同优化调度[J].综合智慧能源,2026,48(4):47-59,13.

基金项目

甘肃省科技重大专项(25ZDGA001)Project Supported by Gansu Province Major Science and Technology Special Project(25ZDGA001) (25ZDGA001)

综合智慧能源

2097-0706

访问量0
|
下载量0
段落导航相关论文