Abstract

Considering the impact of the uncertainty of the initial water level caused by the dynamic control of the operating water level during the flood season on subsequent flood control scheduling,a multi-objective flood control risk analysis method for reservoir groups based on the dynamic control of the operating water level during the flood season was proposed.And Monte Carlo method was used to quantitatively analyze the synergistic effect of hydrological and meteorological forecasting errors,systematically characterizing the uncertainty of the starting water level.A multi-objective flood control optimization scheduling model for reservoir groups considering upstream and downstream flood control target conflicts was constructed by incorporating the uncertainty of the starting water level into flood control risk sources.A multi-level risk index system of"reservoir-point-surface"was proposed,revealing the risk feedback mechanism in stochastic environments.The results of case study in the Dongpi River Basin indicate that the uncertainty of the starting water level cannot be ignored in the short-term flood control process.There is a clear competitive relationship between upstream and downstream flood control targets,and the system risk rate shows marginal benefit characteristics with the selection of non inferior solutions.The coupling effect of uncertainty between flood forecasting and water level adjustment reduces the risk rate of the reservoir group system by 8%,indicating a certain synergistic offsetting mechanism among heterogeneous risk sources.

关键词

汛期运行水位动态控制/水库群多目标防洪调度/风险分析/洪水资源利用/东淠河流域

Key words

dynamic control of operating water level during flood season/multi-objective flood control scheduling of reservoir groups/risk analysis/floodwater utilization/the Dongpi River Basin

引用本文复制引用

曾雨柔,朱非林,卢庆文,樊宇堃,李敏,钟平安..基于汛期运行水位动态控制的水库群多目标防洪风险分析[J].水资源保护,2026,42(2):68-77,10.

基金项目

国家重点研发计划项目(2022YFC3202801,2022YFC3202803) (2022YFC3202801,2022YFC3202803)

国家自然科学基金项目(52009029) (52009029)

水资源保护

1004-6933

访问量0
|
下载量0
段落导航相关论文